NMIMS DEC 2021 PROJECT MANAGEMENT

25 Sep

PROJECT MANAGEMENT

1. India’s Road and Transport Ministry has taken-up various Expressway Road Projects in the country. One of the such project consist of following broad scope of work

a. Constructing roads

b. Constructing tunnels

c. Constructing bridges over river

d. Constructing flyovers and junctions

e. Constructing convenient places (fuels stations, rest areas, etc.)

f. Developing a solution for speed monitoring

g. Finding suitable road material for areas in heavy flood zone

Carry out the Project Risk Management for this case.

2. Government has given you a project of major renovation in railway infrastructure. The project consists of following work.

a. Feasibility study of changes required

b. Estimating the cost – Material and Construction

c. Providing the support to Railway for procuring the material

d. Construction and installation of the changes required

e. Testing of the infrastructure

f. Training and handing over the infrastructure.

You as a project controller are asked to submit your plan for project control. Cover different project control tools and explain how they will be applied in this case. Also, mention as a head of project control which control you will monitor personally and why.

3. Answer the following questions.

a. Consider a hypothetical project of conducting Annual Day in your university. Explain the triple constraints of a project in this context. Include diagram for these constraints and write examples for each constraints.

b. India’s Road and Transport Ministry has taken-up various Expressway Road Projects in the country. One of the such project consist of following broad scope of work

a. Constructing roads

b. Constructing tunnels

c. Constructing bridges over river

d. Constructing flyovers and junctions

e. Constructing convenient places (fuels stations, rest areas, etc.)

f. Developing a solution for speed monitoring

g. Finding suitable road material for areas in heavy flood zone

List different cost estimation methods. Explain any three methods which can be used in this project. Suggest which one will be the best method for this project.

Mobile: – +91- 9741410271

Email: – smu.assignment@gmail.com

Leave a Reply

Your email address will not be published. Required fields are marked *