What is the difference between the assumption of linearity and continuity in LPP?
Decision Analysis & Modeling
1. Decision Analysis involves a systematic decision making process. Explain the approaches to the study of Decision Analysis and Modeling with a suitable example.
2. Explain the application of simulation in business analysis.
3. a. Solve the following problem:
Maximize Z = 40a + 35b
Subject to: 4a + 6b <= 120
8a + 6b <= 192 and a and b both are nonnegative.
3. b. What is the difference between the assumption of linearity and continuity in LPP?
We Assist students in preparing their MBA Case Study Answers| MBA Assignment Solutions | Project Report & Thesis | Contact: Prakash| Call @ +919741410271 / 08722788493 or Email: smu.assignment@gmail.com